HIGH LIFE: Facades in FEEL Tower at 21st Floor Level

The work in Building 1 (SOUL) is progressing at the 17th floor level, in Building 2 (FEEL) at the 21nd floor level, and in Building 3 (HEART) at the 16th floor level. Mast climbers are being installed for the installation of decorative facade cladding.

A contractor has been selected for the finishing of apartments and common areas, and they have already commenced work in the residential buildings of the quarter.

In total, 575 people are involved in the project.

Новости

Preloader image